What Are Some Of The Steps That Should Be Completed During The Design And Pre Construction Phase Of A Project?

What is a pre construction phase plan?

During the pre-construction phase, a strategic plan must be created, a budget and timeline must be agreed upon, a design for the project is begun and finalized, permitting is acquired, and procurement of both labor and resources occurs.

In this article, we’ll provide an overview of the pre-construction phase..

What are the five phases of construction?

A construction project entails 5 important stages: initiation, planning, implementation, performance and monitoring, and closing.

What is a construction schedule called?

In project management, a schedule is a listing of a project’s milestones, activities, and deliverables, usually with intended start and finish dates. … Elements on a schedule may be closely related to the work breakdown structure (WBS) terminal elements, the Statement of work, or a Contract Data Requirements List.

Which of the following is the first phase of construction project?

Initiation phaseInitiation phase. The initiation phase is the beginning of the project. In this phase, the idea for the project is explored and elaborated. The goal of this phase is to examine the feasibility of the project.

What are the construction process?

The ‘construction process’ (sometimes called the ‘construction stage’) is the physical processes of building, landscaping or refurbishing plus all the associated activities, such as demolition, site clearance, administration and so on. … Demolition. Site clearance. Erection of hoardings, welfare facilities and so on.

What are the 6 steps to the design process?

THE DESIGN PROCESS CONSISTS OF 6 STEPS:Define the Problem. You can’t find a solution until you have a clear idea of what the problem is.Collect Information. Collect sketches, take photographs and gather data to start giving you inspiration.Brainstorm and Analyze Ideas. … Develop Solutions. … Gather Feedback. … Improve.

What are the 3 project control methods?

Project control is not simply waiting for things to go wrong and then fixing it. It is chiefly to have systems to identify problems before they manifest themselves. There are three basic types of control mechanisms- cybernetic, go/no-go, and post-performance.

What are the main stages of a construction project?

A standard construction project, in general, has following five major life cycle phases:Initiation.Planning.Execution.Performance and monitoring.Closure.

Who is responsible for the construction phase plan?

The Contractor or Principal Contractor (if there is more than 1 contractor on site) is responsible for the production of the Construction Phase Plan. This plan should address any safety, design or health issues that were identified in the Pre-Construction Plan provided.

What are the 7 steps to effective project design?

7 Steps to Effective Project DesignDefine Project Goal. … Determine Outcomes, Objectives, and/or Deliverables. … Identify Risks, Constraints, and Assumptions. … Prepare a Visual Aid. … Ballpark Your Budget. … Determine Approval and Monitoring Processes. … Use Proper Project Design Documents.

How do you write a project life cycle?

The project management life cycle is usually broken down into four phases: initiation, planning, execution, and closure. These phases make up the path that takes your project from the beginning to the end.

What is the design stage of a project?

Project design is an early phase of the project where a project’s key features, structure, criteria for success, and major deliverables are all planned out. The point is to develop one or more designs which can be used to achieve the desired project goals.

What are the three phases of construction?

The three phases followed are the Design Phase, Construction Phase, and Post-Construction Phase. Design Phase – A projects begins with figuring out the scale of work, which determines project cost and provides enough information to give a beginning estimate.

What are the steps to manage a construction project?

Responsibilities of the construction project managerEstimate project costs.Put together a project budget.Create a schedule.Set up parameters for how the project is executed.Communicate and collaborate with project stakeholders.Educate workers and teams about the contract details.More items…•

What are the 7 steps in design process?

Here are the 7 steps most design projects will have to pass through to get from the initial client briefing to a successful project.Step 1 – Study the Client Brief. … Step 2 – Research, Research, Research. … Step 3 – Brainstorm. … Step 4 – Sketch. … Step 5 – Concept Development. … Step 6 – Revisions. … Step 7 – Completion.

What is project life cycle with example?

The Project Life Cycle consists of four main phases through which the Project Manager and his team try to achieve the objectives that the project itself sets. The four phases that mark the life of the project are: conception / start, planning, execution / implementation and closure.

What does pre construction mean?

Pre-construction is the time to thoroughly assess and plan to mitigate risks associated with constructing the project, including evaluation of the construction site, permit and inspection requirements, and any other special situations that need to be resolved before or during construction.

What is project life cycle?

What is a Project Life Cycle? The project life cycle is a 4-step framework designed to help project managers guide their projects successfully from start to finish. The purpose of the project life cycle is to create an easy to follow framework to guide projects.

What are the first steps of planning a construction project?

What is construction planning?Step 1: Create the project. Create a Project Initiation Document that spells out the people, resources, and budget for the project.Step 2: Draft an initial plan. Use the S.M.A.R.T. … Step 3: Execute the plan. … Step 4: Track your performance. … Step 5: Close out and evaluate.

Who prepares the construction phase plan?

Who produces the construction phase plan? On projects with more than one contractor, it is the principal contractor’s duty to produce the construction phase plan.

What happens in the construction phase?

The construction budget includes labor, material, contractors, construction administration, miscellaneous construction items and contingencies. When construction documents are complete the project is ready to “put out for bid”. This phase includes procurement of labor, materials and finalization of budget.